BMS Facility Deep Energy Upgrades, NYPD
- Grant & Vine

- May 16, 2024
- 1 min read
Updated: Jul 31, 2025

PROJECT DETAILS
CLIENT
LOCATION
Woodside, NY
CONTRACT VALUE
$13,145,814
GRANT & VINE ROLE
Construction Manager
PROJECT STATUS
Completed - May 2024
PROJECT DESCRIPTION
The control upgrade, which will ultimately control all new and existing equipment, is the foremost portion of this project. The new DDC system will allow for equipment and environment setbacks currently not available in this building, thus providing extensive energy savings.
Construction Management services for the removal and replacement of all existing mechanical equipment, addition of heat recovery coils, installation of a Solar PV system, lighting and door upgrades, exterior building insulation system, all new point of use water heaters, and HVAC Controls Upgrade. The mechanical equipment will include the installation of variable frequency drives (VFDs) to enable setbacks. The exterior insulation system will utilize a prefabricated exterior brick veneer-type panel. There will also be interior spray foam insulation in the roof area for added savings.