PROJECT DETAILS

CLIENT


LOCATION

New York, NY (Multiple Depot Locations)


CONTRACT VALUE

$190,000,000


GRANT & VINE ROLE

Design Build Manager/Construction Manager


DESIGN CONSULTANTS


MAJOR SUBCONTRACTOR/SUPPLIERS


PROJECT STATUS

Projected Completion Expected December 2026


PROJECT DESCRIPTION

Design Build Manager for the installation of 230 overhead pantograph and cable reel dispenser bus charging systems at three NYCT bus depot locations throughout the Metro NYC area. The project is being implemented in a fast-track format utilizing multiple Design-Build Teams, ABB and Heliox charging equipment technology, and INIT Charge Management Software. Work is taking place within the following existing bus depots with strict logistical restrictions:


  • Gun Hill Bus Depot – 72 Pantographs

  • Queens Village Bus Depots – 132 Pantographs

  • M.J. Quill Bus Depot – 28 cable reel chargers